Projects & sites

Submit a site report with photos and GPS

Capture daily progress, safety, quality and other reports on your phone, with photos stamped with location and time.

For field teams 4 min read
Submit and approve a site reportNarrated, with on-screen captions. Recorded in the real app.
Read the transcript

Loading…

Step by step

  1. 1

    Start a report

    Open the project and press New report. Choose the Report type: Daily progress report (DPR), Safety observation, Quality check, Inspection, Material receipt, Productivity, Issue report or Handover.

  2. 2

    Fill in the details

    Choose the Site and Work package, check the Date, and enter Work done / summary, Manpower, Equipment on site, Weather, Progress % and Remarks.

  3. 3

    Quantities

    Add rows of Item, Quantity and Unit for work measured today (for example 450 m of cable).

  4. 4

    Photos

    Tap to take photos with the camera. Each photo is stamped with GPS and time if you allow location. Add documents if needed.

  5. 5

    Issues and actions

    Describe Corrective actions, and raise an issue from the report if something needs follow-up.

  6. 6

    Submit

    Press Submit report (or Save draft to finish later). Your manager is notified to review it.

Tip. Unsent report details are kept on your device so a lost signal does not lose your work. This is a convenience copy only; full offline mode is planned for a later phase.